Photos documenting the replacement of structures carrying the Bronx River Parkway over the Bronx River and MTA Metro-North Railroad at Crane Road.
Piers 6 and 5 arm support (view from underneath) |
Wooden light post along pedestrian ramp (view looking south) |
Piers 6, 5, 4 steel work (view from underneath looking south) |
Piers 6 and 5 arm support (view from underneath looking west) |
Piers 4, 5, 6 steel work (view from underneath looking north) |
Steel work for Pier 3 foundation with protected sewer line |
Pier 3 foundation pour |
Piers 6, 5, 4 cores wrapped to maintain desired temperature for concrete cure |
Pier 1 core concrete pour |
Pier 6 bracket arms encased in reinforcing steel |
Pier 6 bracket arms and edge beam encased in reinforcing steel (view from underneath) |
Form work for south abutment wall |
Insulating blankets used to maintain temperature for Pier 3 footing cure |
Pier 6 bracket arms and edge beam encased in reinforcing steel (view from above) |
Pier 6 bracket arms and edge beam encased in reinforcing steel 2 (view from underneath) |
Lift providing access for worker installing bridge bearings |