Photos documenting the replacement of structures carrying the Bronx River Parkway over the Bronx River and MTA Metro-North Railroad at Crane Road.
Pedestrian ramp columns and pier caps |
Protecting the existing 54" sewer at pier 4 |
Steel beams installed in pier 4 footing to protect existing 54" sewer |
North abutment wall showing blind arches detail |
Form work and reinforcement for pier 6 |
Middle abutment south facing wall |
Form work and reinforcement for pier (overhead view) |
Middle abutment wall adjacent to MTA Metro-North Railroad looking south |
Completed pedestrian ramp columns and pier caps |
Pedestrian ramp precast sections |
Micropile installation |
Micropile casings plus internal reinforcement rods |
Soldier pile drilling machine |
Pedestrian ramp (side view) |
600-ton crane (lower view) |
600-ton crane |
363,000 lbs. of crane counter weights |
Crane maneuvering 4 ft. x 100 ft., 100,000-lb beam into place over railroad |
Crane maneuvering 4 ft. x 100 ft., 100,000-lb beam into place over railroad - 2 |
Crane maneuvering 4 ft. x 100 ft., 100,000-lb beam into place over railroad - 3 |
Crane maneuvering 4 ft. x 100 ft., 100,000-lb beam into place over railroad - 4 |
Crane maneuvering 4 ft. x 100 ft., 100,000-lb beam into place over railroad - 5 |
Pier 5 formwork and reinforcement |
Micropile installation |
Pedestrian ramp (switch back view) |
Inside the steel core for pier at fabrication plant |
Steel component fabrication in plant |
Pier bracket arms (upside down) at fabrication plant |
Steel component drilling at fabrication plant |
Pier and bracket arms temporarily assembled (upside down) in fabrication plant |
Pier edge beams attached to bracket arms,temporarilyassembled (upside down) at fabrication plant |
West half of pier 4 footing over sewer |
Pier 4 footing with core reinforcement |
Preperation for pier 4 concrete pour |
Pier 5 stoneinstallation |
Pier 6 stone installation |
Pier 6 and middle abutment stone installation |