Photos documenting the replacement of structures carrying the Bronx River Parkway over the Bronx River and MTA Metro-North Railroad at Crane Road.
Pier 1 steel (view looking west) |
Pier steel (view looking north from south) |
Miscellaneous rebar hoops prior to install |
Pier steel with reinforcing bars (view looking north along the bridge) |
Concrete encased bracket arms (view from underneath) |
Pier 1 Concrete Forms for Bracket Arms |
Drainage structure and light pole soil plate |
Trench for drainage pipe |
Concrete encased steel prior to placement of bridge deck |
Stone masionary installation |
Mushroom bridge deck form work |
Top view showing deck form work (close up) |
Top view showing deck form work (close up) 2 |
Middle abutment approach slab concrete curing |