Photos documenting the replacement of structures carrying the Bronx River Parkway over the Bronx River and MTA Metro-North Railroad at Crane Road.

 

Spring II - 2014

Pier 1 steel (view looking west)

Pier 1 steel (view looking west)

Pier steel (view looking north from south)

Pier steel (view looking north from south)

Miscellaneous rebar hoops prior to install

Miscellaneous rebar hoops prior to install

Pier steel with reinforcing bars (view looking north along the bridge)

Pier steel with reinforcing bars (view looking north along the bridge)

Concrete encased bracket arms (view from underneath)

Concrete encased bracket arms (view from underneath)

Pier 1 Concrete Forms for Bracket Arms

Pier 1 Concrete Forms for Bracket Arms

Drainage structure and light pole soil plate

Drainage structure and light pole soil plate

Trench for drainage pipe

Trench for drainage pipe

Concrete encased steel prior to placement of bridge deck

Concrete encased steel prior to placement of bridge deck

Stone masionary installation

Stone masionary installation

Mushroom bridge deck form work

Mushroom bridge deck form work 

Top view showing deck form work (close up)

Top view showing deck form work (close up)

Top view showing deck form work (close up) 2

Top view showing deck form work (close up) 2

Middle abutment approach slab concrete curing

Middle abutment approach slab concrete curing