Photos documenting the replacement of structures carrying the Bronx River Parkway over the Bronx River and MTA Metro-North Railroad at Crane Road.
|
Bridge over railroad prior to installation of the last 7 beams. (view looking south) |
|
Bridge bearings in place on the middle abutment (view looking north) |
|
250 ton crane positioned at the north abutment (view looking north) |
|
Two 250 ton cranes in position for the beam placement (view looking south) |
|
Truck carrying 100 ft long, 4 ft wide, 3.3 ft high 100,000 lb precast concrete beams |
|
Truck carrying 100,000 lb precast concrete beam making turn |
|
Iron worker helping to position precast beam |
|
Close up of precast beam placement |
|
Crew preparing for last beam to be maneuvered into place |
|
Cranes simultaneously lifting beam off trailer |
|
Cranes maneuvering beam into place |
|
Lowering last beam into place. Workers threading steel tendons through beam |