Summer - 2014
Photos documenting the replacement of structures carrying the Bronx River Parkway over the Bronx River and MTA Metro-North Railroad at Crane Road.
|
Bolt setup for light post foundation |
|
Installation of new catch basin |
|
Installation of new catch basin (side view looking north) |
|
Concrete placement for new bridge deck |
|
Multiple construction crew members at work during concrete deck placement |
|
Underside of bridge deck |
|
Peir preparation prio to installation of corbel stones |
|
Corbel stone |
|
Light pole blister (side view) |
|
Northbound roadway sub-base looking south |
|
Exit 12 nourthbound rail section installation |
|
Guide rail installation between NB BRP and SB Exit-ramp to Crane Rd (looking south) |
|
Guide rail for deceleration lane to Exit 12 (view looking north) |












