Ashford Avenue Bridge aerial view

 

 

 

 

 

 

 

 

Week of Feb. 5, the following lane closures are planned for the Ashford Avenue Bridge Project:

Saw Mill River Parkway

Monday - Friday - (Day) - Remove Bridge Overhang Brackets and Install Guiderail

  • NB Left or Right lane closed from 9 a.m. to 2 p.m.
  • SB Left or Right lane closed from 10 a.m. to 2:30 p.m.

Monday - Thursday - (Night) - Remove Bridge Overhang Brackets

  • NB Left or Right lane closed 8 p.m. to 5 a.m.
  • SB Left or Right lane closed 8 p.m. to 5 a.m.


New York State Thruway (I-87)

Monday - Friday (Day) - Remove Bridge Overhang Brackets

  • NB Left or Right lane closed 9 a.m. to 9 p.m.
  • SB Left or Right lane closed 9 a.m. to 9 p.m.

Monday -Thursday (Night) - Remove Bridge Overhang Brackets

  • NB (two) lanes closed 9 p.m. to 6 a.m.
  • SB (two) lanes closed 9 p.m. to 6 a.m.


Ashford Avenue Bridge

Monday - Friday  – (DAY)-  Bridge Joints

  • 1 lane in each direction closed from 9:30 a.m. to 3:30 p.m.

Monday - Friday – (NIGHT) - Bridge Joints

  • 1 lane in each direction closed from 7:00 p.m. to 7:00 a.m.


Ashford Avenue Ramp to and from the NB Saw Mill River Parkway

  • Should open before the end of the week.

Detours are posted utilizing Route 9A (Saw Mill River Road) and Lawrence Street.  In addition, multiple Variable Message Signs (VMS) are activated to notify motorists of the Ramp closures.

Motorists are advised to use an alternate route to avoid delays.

Read more about the details of this project.

Thank you for your patience and understanding.